Sunday, December 28, 2025

Chipmunk Chronological Confusion Corner

 "Theo vs Simon" is a particularly wonderful episode of ALVINNN!!! and the Chipmunks. But there's something about the sequence of events in it that I find a little strange. Just follow through these scenes from the episode, and see what you think.

Poor little Theodore has come to believe that Simon is better than him at everything, when he discovers that Simon once won a trophy for baking brownies - he makes Simon whip up another batch to see what they're like, and when they turn out to be delicious, Theo runs up to their bedroom, crying.


Just as an aside, reason number 5616581651 why I love this cartoon - the way it depicts crying. Most modern cartoons go with anime-style exaggerated floods of tears, but Chipmunks draws it very realistically, which works much better.

And when they cry is done brilliantly, too, with a consistent and well-thought-out grasp of character. Theo is in tears a lot, because he's the emotional type. Alvin cries much less frequently, and only when the world is genuinely being unfair to him (on those rare occasions when he tells the truth, and finds that people don't believe him!) And Simon only ever cries when both his brothers are already sobbing - which only happens in the subset of episodes when they believe they've lost Dave forever.

But back in "Theo vs Simon", Simon comes up to the room to try to talk to Theodore.


I just want you to know, Theodore, I am so impressed with all that you do!
Oh, shove it! You're just the best! You're the best at everything, okay!
Theodore, look - everybody loves you! You listen to people! And people trust you with their feelings! That's huge!
That doesn't count! That's easy!
I'm sure there's a lot of things that you're better at than me!
Oh yeah? Like what?
Well, you pick! Pick anything!
Okay. Okay, I will!

Theodore stomps out. And the next scene starts with Theo standing by the pool, and Alvin coming out to join him.


How you doing, Theodore?
He's just so good, at so many things!
Why do you keep challenging him, Theodore? Simon's good at a lot of things, but that doesn't mean you're not!
Yeah, but I wanna be better than him at one thing! One important thing! Not just being nice and cuddly!
Oh Theodore, I got it! The drums! It takes years to master!

Did we miss something here? We haven't seen Theodore challenging Simon to things repeatedly yet! Anyway, Alvin arranges a drum-off, and Simon... gets a bit carried away.


At first Simon just tries to concede defeat, but when Theo insists he show what he can do, Simon plays a wonderful drum solo, Theodore screams, kicks his drum kit to pieces and runs back to the bedroom. "Nice going, champ," Brittany tells Simon, who protests "Theodore, that was a fluke! That never happened! Honestly!" and follows him back to the bedroom...


And the dialogue in this scene is another of my all-time favourites.

Theodore, look, let's just do it again. You know, that was a once-in-a lifetime...
Stop! Stop! I... I hate this. And I don't want you to make yourself worse, just so I feel better!
Oh, there, Theodore, you see? You are so emotionally mature! You're the best at that!
Oh, be quiet! They don't give out trophies for that!
Well, yes, but I... (Theodore puts his hand over Simon's mouth) mmpphh mmf...
I, I know it's not emotionally mature, but I need to beat you at something! I'm sorry, it's just really gonna bother me until I do...

And THEN, we cut to the musical number for the episode (a great song, as always) with a montage of Theodore challenging and losing to Simon at running, basketball, Rubik's cube, sandcastle building and finally blowing bubbles by the pool.


It ends with Theo standing by the pool, just where Alvin found him at the start of the earlier scene. The next scene picks up at the start of the next day, as they're going to school, and Simon tells Alvin "It's getting really bad. Last night he challenged me to shove myself into a to-go bag!"

And I just feel like the song montage should have come after the first bedroom scene, not the second! I mean, it does still work in the sequence of events we get here, but it just seems like it makes more sense to put the music before the drum-off. Maybe it's just me. Or maybe the song needed to be placed at a particular time-point in the episode. Or maybe someone just put it after the wrong one of the two very similar Simon/Theo bedroom scenes?

It's probably just that I think too much about these things. But don't worry, there is a happy ending to this episode, and I really recommend that you check it out!

Friday, December 26, 2025

Mar-Might will save the day

 This advert appears in Transformers No.102, dated 28th Feb.87:


Send for your Marmiteers Fun Pack! It seems to be a very short-lived attempt to make children urge their parents to buy lots of Marmite - you had to send away "only 16oz worth of Marmite labels", which is quite a lot. The little jars of Marmite in those days were 4 ounces (the labels said 113g, but they hadn't yet moved to selling them in round numbers of grammes). If the household only bought a little jar at a time, people eager to read the adventures of Jo-Jo, Bruno and Mar-Might must have been really spreading the stuff heavily on their toast!

I don't know of anyone who got the Fun Pack. I must try to find one some day. I don't dislike Marmite, but it just doesn't seem like something you'd try to promote to children in this way, even in the days when the Transformers comic was chock-full of adverts for the Weetabix gang on their latest adventure. I'd still like to know exactly what Marmite-themed fun our heroes had...

Saturday, December 20, 2025

Excelsis

 There's a great article here about Diarmuid Early, winner of the Microsoft Excel World Championship and a really nice guy all round!

Can I encourage you to join in next year's competition? I promise you it's a lot of fun! Full details pending, but this is the schedule of days to set aside half an hour for solving puzzles by means of spreadsheet formulas as quickly as possible.


You don't have to be weird to do this, but it helps.

Tuesday, December 16, 2025

Sic transit gloria mundi

 This meme I saw on the internet is rather sad, really.


I mean, there are a lot of things in here I used every day and to think that they're now museum pieces is downright depressing. I've never had an AOL address, though, so I win there. Mainly because I've had the same yahoo email address for 27 years now, but that doesn't show my age at all, right? And I think I've only ever slept on a waterbed once. And I'm not American, so I've never written in 'cursive' as the writer of this meme understands the word, probably. Does that mean I'm still young? Answers on a postcard.

Sunday, December 14, 2025

Ridiculosa!

 The Sparky Book 1978 includes two adventures for "Ma Fia and her Mob". Not a regular strip in the weekly Sparky comic, or as far as I can tell, anywhere else.




I thought they might have been borrowed from somewhere else to fill space in the annual (the Sparky at this time did include The Circus of P. T. Bimbo, imported from America and similarly playing on old American stereotypes), but research on the internet draws a complete blank - a lone website cataloguing the contents of this Sparky Book is all Google turns up. The website in question describes it as "relying on cheap racial stereotyping for humour! Yet another case of scraping the barrels bottom again." - which, yes, is fair, but I always rather liked these two comics and hoped to see more of them!

Is there really no more than this? You could churn out a good few more strips along these lines before you run out of the stock of tired old clichés, and I know I at least would like to see them! Could they have appeared under a different name somewhere? I think Ma is due a revival, anyway.

I did put the second strip into Google's image search to see if anything would turn up, but all I got was Google's AI summarising the story in its own unique style:

No, thank you. Honestly, I can't help thinking they need to work a bit more on the whole AI thing before automatically forcing it on people who use Google to search for things. There are some very stupid people out there, after all, and I worry about what they're going to end up believing. I do like the way it's quite good at interpreting the dialogue, but spectacularly fails to pick up on what's actually happening in the story. It's reassuring to know computers are still so dimwitted, we can thwart their inevitable takeover of the world by asking them to define love.

Wednesday, December 03, 2025

How old is Johnny?

 A couple of Christmases ago, I went on at great length about the Johnny Ludlow papers written by Mrs Henry Wood, and noted that compiling a definitive chronology of Johnny's life and times is something I'm going to do one of these days. It still is, but it's more a thing to do when I've won the lottery and have nothing better to do with my time for months or years on end.

But as I said in that essay, the lynchpin for establishing Johnny's timeline is the story in which Easter Monday falling on April 24th is an essential part of the plot. Since the whole point of this game is to pretend Johnny is a real person, telling true stories, he can't have been mistaken about the year there, and it must have happened in 1848. Which makes the story "Roger Bevere", featuring a well-established London underground railway, rather problematic. And there's another story which gets anachronistic in the other direction...

"Anne", a three-part story published in the Argosy Magazine from October to December 1876, is a good one for tying all the stories together in one coherent chronology. Johnny tells us it's the year when Jacob Lewis, the old rector of Timberdale, died and was replaced by his stepson Herbert Tanerton (who goes on to appear in many other stories). And Johnny the narrator is even kind enough to remark parenthetically that "This year that I am now telling of was the one that preceded the accident to King Sanker." - so we can set this as early in Johnny's life, and prior to the other stories involving the Sanker family and the people they interact with.

Johnny doesn't tell us how old he is during this story - he's clearly a youngish boy, "years and years" younger than the heroine Anne Lewis, but still able to have mature conversations with her about her problems. Which are, basically, the plot of Cinderella. Mrs Henry Wood loved the Cinderella story and told it over and over in her works, but never more so than in this story. And it's when Anne acquires her wicked stepmother and two ugly sisters that the date of the story comes into question.


"St. Michael's Church stood in a nook under the cathedral walls: it is taken down now. It was there that the wedding took place." says Johnny the narrator. And the unusually-located church was indeed a real place in Worcester. And it was 'taken down' in 1843. A replacement church nearby had been built in 1839, and you wouldn't think the old place was still being used for weddings right up to its demolition. So does this story, and by implication all of Johnny's youthful adventures, take place so far back as 1840 or so?

You wouldn't think it could be. It's ambiguous exactly how old Johnny is here, but we can't really put it five or more years before "Watching on St. Mark's Eve". Let alone twenty years before the London Underground opened, if we're to believe "Roger Bevere".

And speaking of trains, when Anne and her father first come to the (fictional) village of Crabb, they're collected from "the station". All the other stories set in and around North and South Crabb have a very busy train station, Crabb Junction, in South Crabb - it's explained that the little place happens to be on the intersection of multiple train lines, which is reasonable enough, but surely must mean that the station was built during the "railway mania" of the 1840s. Shifting Johnny Ludlow's childhood back early enough to set that wedding in St Michael's throws everything just that little bit askew. It's surprising how "Victorian times" actually encompasses a whole lot of rapid change and development once you start looking at railways.

I think Johnny's getting his churches confused and misremembering. The unfortunate Dr Lewis and the awful Mrs Podd got married in the new church, and all those years later when he comes to write the story for the magazine Johnny thinks it was the old one. This is the kind of thing you have to read into the text if you want to be a chronologist. I'll write that full Johnny Ludlow history one day, and it'll all make sense, you'll see!

Monday, November 24, 2025

Cuphead and his pal Mugman, they like to roll the dice

 Further to my last-but-one blog post, the latest cartoon I've been enjoying is The Cuphead Show. And I'm fascinated to see that seasons 1 and 3 are rated PG, with the warning "Rude humour, threat", while season 2 gets a U certificate but the extended caution "Rude humour, dangerous behaviour, violence, threat". I'm not sure which season is more unsafe to watch, based on this.

It's a good cartoon, though, in an uneven kind of way. But I've only watched the first season so far, and maybe it improves. Anything inspired (via a video game) by Max Fleischer cartoons has to be worth a watch, at least. And the game itself was great-looking and not as great to play as it probably should have been. I'm just too picky, possibly. And rude.


Sunday, November 23, 2025

Anton's Syndrome is no laughing matter

 To commemorate its eighteenth anniversary, I would like to provide the answer to the riddle posed by this story. Henry, as the reader can easily deduce from his depiction throughout the text, is the type of person who would ensure the ceilings of his home are a colour that no human being could under any circumstances ever express dissatisfaction with. When the Archbishop of York said he didn't like them, Henry realised that the Archbishop must be blind and not be personally aware of it. So making him believe he'd fed paupers to hungry lions was a simple matter of Henry making the appropriate noises.

I'd intended to include that explanation in the story, but then decided it would be funnier not to.

Saturday, November 15, 2025

NUTS2U

 

I've got Netflix as part of my Sky subscription. I wouldn't have Netflix if I had to pay for it, because there's almost nothing on it that anyone would want to watch. The same applies to all telly, actually. I've only got Sky because I don't want people to think I'm too poor to afford television. I've gone without TV for lengthy periods when there wasn't going to be anyone seeing that I haven't got it. I probably shouldn't care so much about what people think, and focus solely on telling people what I think.

Anyway, the only thing any sane person could want to watch (extensively) on Netflix is "ALVINNN!!! and the Chipmunks". And I'm intrigued by the content warnings applied to each season's box set. They all merit a U certification, but Season 1 follows it with "Language". Seasons 2, 3 and 4 seem to be a little more risqué, because they all warn of "Rude humour, references to crime, violence, threat". And then Season 5 (the best season), tones the warning down to "Rude humour, violence".

I think Chipmunks is minimally rude - there's certainly no 'language' worse than the occasional use of "nuts" to express annoyance in a chipmunky kind of way. And while there are occasional references to crime, I don't think these are reduced in Season 5. People who tremble at the very mention of crime should definitely still avoid it. Theodore steals Miss Croner's cherries in one episode. A criminal from the future steals Simon's invention and threatens to maroon Alvin in dinosaur times in another. Really, references to crime and threat abound in this cartoon, and people should definitely steer clear!

Friday, October 31, 2025

Englishness at 78% and still rising

 Happy Halloween! October is a special month not just because of my birthday, but because of ancestry.co.uk's annual update of their DNA ethnicity estimate! It's become something of an annual tradition - check out my previous blogs on the subject!

In October 2022, I got the results of the sample I'd sent in, and found that it said I'm 69% from "England & Northwestern Europe". A bit on the low side, I thought. And significantly Swedish or Danish on my mother's side too, with a big chunk of Scotland on my father's. Plus 1% of Norway.








In October 2023, Ancestry had improved their estimations, and upgraded me to 76% Englishness, draining away a bit of the Swedishness and Scottishness.










In October 2024, I had inched up to 77% on the Englandometer, with decreasing Danishness and a surprising shift in my father's heritage into the unexplored regions of "Germanic Europe" and the Netherlands. What will this latest year's update bring?









Well, it's the biggest update ever, and England has fractured into at least three independent parts!

Which makes it a little harder to track just how English the Ancestry world thinks I am, but we can just add together the East Midlands, West Midlands and "Southwestern England & Northwestern Europe" to see I've gone up one more percentage point, making 78%! I'm getting ever closer to being the Full English Breakfast!
"East Midlands" seems to include Sheffield, where a big chunk of my father's side come from (his father's family originated in Rutland and moved to Sheffield in the 1800s; the Millership side were longer-established in Sheffield), so it does work. And people who aren't familiar with the precise details of my family tree and can't be bothered to read those old blogs might need to know that my maternal grandfather (who died when my mum was a baby) came from London, so giving me 25% of that doesn't seem unreasonable.

But let's have a look by parent. You have to give Ancestry money to get it to say "mother" and "father", apparently, but we can see from the cheap version that "Parent 1" is my dad and "Parent 2" my mum...

My dad is now twice as Dutch as he used to be, and 2% Irish too! Meanwhile, my Scandinavian side has shrunk sharply, leaving me just 3% of Denmark, with a big part of my mum suddenly having become Scottish or Northern Irish. Parts of me are shifting slowly around Europe, but it's gradually coalescing into making me English. Give it another couple of decades...

My dad did go to Amsterdam once, you know. Among his effects I found an old temporary passport dating to 1976, and I very vaguely remember that there was some kind of anecdote about "the time I went to Amsterdam, before you were born." So maybe he was getting in touch with the distant ancestors.

Tuesday, October 28, 2025

Happy birthday, Leonard Starr!

 The principal creative force behind perhaps the greatest cartoon series of the 1980s was born 100 years ago today! Thundercats remains a delight to watch, even after all this time, and I've celebrated the centenary by watching the first episodes, on the videotape I recorded them on when they were first shown. It doesn't get old.



Sunday, October 26, 2025

They've got thirty-nine flavours of ice cream there. Maybe even more.

 One thing it's surprisingly hard to find on the internet is a list of Transformers toys that the poor deprived children of Britain weren't able to get in the 1980s. Transformers were very cool back then, and the knowledge that there were certain of the toys that were only available in America was an endless source of misery.

The otherwise excellent tfwiki.net is rather disappointingly incomplete when it comes to specifically detailing what toys were sold in Britain. They just had a "Europe" section, even though the continent had a wide range of Transformer distribution, and it's been inconsistently modified over the years to give more details, while still leaving some important facts out.

I mean, I could go in and change it myself instead of just moaning about it on my blog - that's what you're supposed to do with wikis, after all - but the whole website is really very professional and stylish and nicely written, so I don't want to bulldoze all over it. It feels like that would be rude. So I'll just document everything here - research backed up by checking the comics and catalogues and leaflets of the time, and my own almost-reliable memories of up to 41 years ago...

1984
We did get the whole of the original range of Transformers. Eventually. The rest of Europe didn't get them until 1985, apparently, so the wiki probably still has some leftover pages saying that applied to us too, but I can personally assure any doubters that the toys were here almost as soon as they were in America. Except Megatron. And five of the Autobots.

BreedName
Autobot leaderOptimus Prime
Autobot carsJazz
Autobot carsBluestreak
Autobot carsRatchet
Autobot carsHound
Autobot carsMirage
Autobot carsSideswipe
Mini-AutobotsBumblebee
Mini-AutobotsHuffer
Mini-AutobotsCliffjumper
Mini-AutobotsBrawn
Mini-AutobotsWindcharger
Mini-AutobotsGears
CommunicatorSoundwaveBuzzsaw
Strike PlanesStarscream
Strike PlanesThundercracker
Strike PlanesSkywarp
Spy CassettesRumbleRavage
Spy CassettesLaserbeakFrenzy
Decepticon leaderMegatron
Autobot carsProwl
Autobot carsSunstreaker
Autobot carsIronhide
Autobot carsWheeljack
Autobot carsTrailbreaker

(Just a note about terminology - the word 'breed' was used to describe the category of Transformers just a couple of times over the years, it certainly wasn't any kind of official phrase. I just think it's funny. The 'breeds' listed throughout this blog are the names by which the kinds of toys were generally known and advertised. Please pay attention to 'strike planes', because there's a tendency on sites like tfwiki to use 'seekers', which wasn't at all the term anyone used in 1984, I assure you. You don't get to make up new names for strike planes unless you were there and eight years old.)

The ones in the box at the bottom didn't show up on our toy shop shelves until around Easter 1985. It was well known (meaning it was entire guesswork, but very plausible) that there was some worry about releasing the toy of Megatron, which turns into a very realistic gun. But if that was the problem, then the toy makers' argument of "we want to make money by selling this gun" seems to have won out in the end. As for the other five, I guess someone just felt there were too many toys in the range, and just one assortment of six cars would be the most sensible policy. When the toys became super-popular, naturally they wanted to release the rest too. But not quite all of the 1985 toys made it to these shores...

1985
Autobot carsGrappleDeluxe vehiclesRoadbuster
Autobot carsRed AlertDeluxe vehiclesWhirl
Autobot carsSkidsScientistPerceptor
Autobot carsHoistCommunicatorBlaster
Autobot carsInfernoDinobotsSwoop
Autobot carsTracksDefence baseOmega Supreme
Autobot carsSmokescreenConstructiconsScrapper
Mini-AutobotsPowerglideConstructiconsScavenger
Mini-AutobotsBeachcomberConstructiconsLong Haul
Mini-AutobotsWarpathConstructiconsMixmaster
Mini-AutobotsSeasprayConstructiconsHook
Mini-AutobotsCosmosConstructiconsBonecrusher
DinobotsGrimlockDeluxe InsecticonsVenom
DinobotsSludgeDeluxe InsecticonsBarrage
DinobotsSlagDeluxe InsecticonsRansack
DinobotsSnarlDeluxe InsecticonsChop Shop
JumpstartersTopspinMilitary operationsShockwave
JumpstartersTwin Twist
Air guardianJetfire
Strike PlanesRamjet
Strike PlanesThrust
Strike PlanesDirge
InsecticonsShrapnel
InsecticonsKickback
InsecticonsBombshell
Triple ChangersAstrotrain
Triple ChangersBlitzwing

What a lot of exciting new toys! And since the 1984 range were all still available, those toy shelves were really crowded! But not quite as crowded as they could have been. Jetfire wasn't shown on the leaflet that came with the toys, which otherwise showed everything you could buy, so I assume he came out a bit later (there were probably copyright issues, since the toy was licensed from a different source to most of the others). The toy was definitely on sale well before the end of 1985, though.

NOT on sale, though, were characters prominent in the comic and cartoon that everyone in Britain followed. The awesome Decepticon leadership rival Shockwave couldn't be bought here. Nor could the Constructicons, who combined into a giant robot! Nor could Swoop, one of the five Dinobots, and I can't imagine what the reason for that one was.

Blaster and Perceptor were less well-known here until 1986, when they showed up in the comic and cartoons. The Deluxe Vehicles and Deluxe Insecticons were even more obscure - and again, probably because of licensing issues. Omega Supreme was a very very big toy, and perhaps it was just felt he wouldn't sell well enough over here. But that's seventeen toys we might have wanted in Britain if we'd even known they all existed, and America is starting to sound like a land that's hoarding all the coolest characters for themselves!

1986
ProtectobotsHot SpotSpy CassettesRatbat
ProtectobotsBladesSpy CassettesRamhornEject
ProtectobotsStreetwiseSpy CassettesRewindSteeljaw
ProtectobotsGroovePredaconsRazorclaw
ProtectobotsFirst AidPredaconsRampage
AerialbotsSilverboltPredaconsHeadstrong
AerialbotsSlingshotPredaconsTantrum
AerialbotsSkydivePredaconsDivebomb
AerialbotsFireflightSharkticonGnaw
AerialbotsAir RaidCityTrypticon
New LeadersUltra MagnusSpace shuttleSky Lynx
CityMetroplex
Autobot carsHot Rod
Autobot carsKup
Autobot carsBlurr
Mini-AutobotsWheelie
Mini-AutobotsHubcap
Mini-AutobotsSwerve
Mini-AutobotsTailgate
Mini-AutobotsPipes
Mini-AutobotsOutback
Triple ChangersSpringer
Triple ChangersSandstorm
Triple ChangersBroadside
StunticonsMotormaster
StunticonsBreakdown
StunticonsDrag Strip
StunticonsDead End
StunticonsWildrider
CombaticonsOnslaught
CombaticonsVortex
CombaticonsSwindle
CombaticonsBrawl
CombaticonsBlast Off
New LeadersGalvatron
Strike PlanesCyclonus
Strike PlanesScourge
Triple ChangersOctane
BattlechargersRunabout
BattlechargersRunamuck
Autobot heroesRodimus Prime
Autobot heroesWreck-Gar

1986 was the year of Transformers: The Movie, although it didn't get to our cinemas until late in the year. That caused the two Autobot Heroes to slip into 1987's toy range in this country, since the existence of Rodimus Prime is a spoiler for the thrilling climax of the movie.

The start of 1986, though, was all about the Special Teams - Protectobots, Aerialbots, Stunticons and Combaticons. They each combined into a giant robot, and since we had never had the Constructicons, this was something new and hugely cool!

But we didn't get the Predacons, the coolest of all combining teams. They were later additions to the 1986 range in America, but left out completely over here. Maybe they didn't want to flood the market. And this year shows the start of the British policy of not releasing spy cassettes. Since they were designed to fit into Blaster (who also hadn't been released here) and Soundwave (whose toy was old and being delisted) it makes sense, I suppose. And Sky Lynx is a big toy, and Trypticon even bigger, and having already released Metroplex I suppose the British powers that be thought that was enough to be going on with...

1987
TechnobotsScattershotSpy CassettesOverkillSlugfest
TechnobotsLightspeedClonesFastlaneCloudraker
TechnobotsStrafeClonesPounceWingspan
TechnobotsNoseconeDouble SpyPunch/Counterpunch
TechnobotsAfterburnerMonsterbotsRepugnus
ThrottlebotsGoldbugMonsterbotsGrotusque
ThrottlebotsFreewayMonsterbotsDoublecross
ThrottlebotsSearchlightHeadmaster CityFortress MaximusSpike
ThrottlebotsChaseSix ChangerSixshot
ThrottlebotsRollbar
ThrottlebotsWide Load
HeadmastersBrainstormArcana
HeadmastersHardheadDuros
HeadmastersChromedomeStylor
HeadmastersHighbrowGort
TargetmastersSureshotSpoilsport
TargetmastersCrosshairsPinpointer
TargetmastersPointblankPeacemaker
TargetmastersHot RodFirebolt
TargetmastersKupRecoil
TargetmastersBlurrHaywire
TerrorconsHun-Grr
TerrorconsBlot
TerrorconsCutthroat
TerrorconsSinnertwin
TerrorconsRippersnapper
Headmaster CityScorponokZarak
HeadmastersMindwipeVorath
HeadmastersSkullcruncherGrax
HeadmastersWeirdwolfMonzo
Headmaster HorrorconsSnapdragonKrunk
Headmaster HorrorconsApefaceSpasma
TargetmastersSlugslingerCaliburst
TargetmastersMisfireAimless
TargetmastersTriggerhappyBlowpipe
TargetmastersCyclonusNightstick
TargetmastersScourgeFracas
DuoconsBattletrap
DuoconsFlywheels

Headmasters and Targetmasters were the big deal in 1987! They each came with a littler figure who transformed into their head or gun. But the biggest one of all, Fortress Maximus, was again denied to us. Not that we could have afforded something so big, of course, but it would have been nice to see that enormous box on the shelves of Woolworths or Beatties! A lot of the other non-available ones this year were featured on the video "Headmasters: The Rebirth", which was widely bought and enjoyed, at least partly because it told us about some fascinating toys that just weren't available to us!

1988
Powermaster LeaderOptimus PrimeHi-QPretendersGroundbreaker
PowermastersGetawayRevPretendersSky High
PowermastersJoyrideHotwirePretendersSplashdown
PowermastersSlapdashLubePretendersBugly
HeadmastersHoseheadLugPretendersFinback
HeadmastersNightbeatMuzzlePretendersIguanus
HeadmastersSirenQuigSpy CassettesSquawktalkBeastbox
TargetmastersLandfillFlintlockSilencerSpy CassettesGrand SlamRaindance
TargetmastersQuickmixBoomerRicochet
TargetmastersScoopHolepunchTracer
PretendersCloudburst
PretendersLandmine
PretendersWaverider
Pretender BeastsCatilla
Pretender BeastsChainclaw
TriggerbotsBackstreet
TriggerbotsDogfight
TriggerbotsOverride
SparkabotsSizzle
SparkabotsFizzle
SparkabotsGuzzle
Six ChangerQuickswitch
PowermastersDarkwingThrottle
PowermastersDreadwindHi-Test
Powermaster Double AgentDoubledealerKnokSkar
HeadmastersFangryBrisko
HeadmastersHorri-BullKreb
HeadmastersSqueezeplayLokos
TargetmastersNeedlenoseSunbeamZigzag
TargetmastersQuakeTiptopHeater
TargetmastersSpinisterHairsplitterSinge
PretendersBomb-Burst
PretendersSkullgrin
PretendersSubmarauder
Pretender BeastsCarnivac
Pretender BeastsSnarler
TriggerconsCrankcase
TriggerconsRuckus
TriggerconsWindsweeper
FireconsCindersaur
FireconsFlamefeather
FireconsSparkstalker
SeaconsSnap Trap
SeaconsOverbite
SeaconsSeawing
SeaconsNautilator
SeaconsSkalor
SeaconsTentakil
Pretender VehiclesGunrunner
Pretender VehiclesRoadgrabber

In 1988, we nearly got everything. Just a few spy cassettes and half the Pretenders were never released here. The missing Pretenders were delayed in America, apparently, as were the Pretender Vehicles - the latter aren't on this year's leaflet, but they definitely did come out here eventually. The six Normal Pretenders, though, became the last cool Transformers that didn't get to British collectors.

1989

PretendersDoubleheader
PretendersLongtooth
PretendersPincher
Pretender ClassicsJazz
Pretender ClassicsGrimlock
Pretender ClassicsBumblebee
Mega PretendersCrossblades
Mega PretendersVroom
Ultra PretendersSkyhammer
PretendersBludgeon
PretendersStranglehold
PretendersOctopunch
Pretender ClassicsStarscream
Mega PretendersThunderwing
Ultra PretendersRoadblock
Micromaster Race Car PatrolRoadhandlerFree WheelerTailspinSwindler
Micromaster Off Road PatrolHigh JumpMudslingerPowertrainTote
Micromaster Battle PatrolBig ShotSunrunnerSidetrackFlak
Micromaster Rescue PatrolSeawatchFixitStakeoutRed Hot
Micromaster StationsIronworksConstruction station
Micromaster StationsHot HouseFire station
Micromaster TransportsErectorCrane
Micromaster TransportsOverloadCar carrier
Micromaster BasesGroundshakerATV
Micromaster Air Strike PatrolNightflightStorm CloudTailwindWhisper
Micromaster Sports Car PatrolBlackjackDetourHyperdriveRoad Hugger
Micromaster StationsAirwaveAirport
Micromaster StationsGreasepitGas station
Micromaster TransportsFlattopAircraft carrier
Micromaster TransportsRoughstuffMilitary transport
Micromaster BasesSkyhopperHelicopter
Micromaster Space ShuttleSkystalkerInterstellar shuttle
Micromaster Rocket BaseCountdownRocket base
Pretender MonstersSlog
Pretender MonstersBristleback
Pretender MonstersIcepick
Pretender MonstersWildfly
Pretender MonstersScowl
Pretender MonstersBirdbrain

A clean sweep of the American 1989 range was available to us limeys! Countdown and the Monsters don't feature on the leaflet, and may have come out later, but they were certainly with us eventually. Britain has now reached equality with America at last!

And we went on to greater heights than that! As the nineties dawned, the USA was giving up on Transformers. There were more Transformers released in Britain from this point onwards! It started in 1990 with 'Classics' rereleases of older toys, alongside all the new American ones, and then in 1991 when the entire range was cancelled in America, Britain just kept going, churning out more and more Autobots and Decepticons that stateside fans could only dream of! Revenge is finally ours!